Search

£1m Shoreditch assembly hall revamp complete

PUBLISHED: 11:16 15 November 2015 | UPDATED: 11:16 15 November 2015

Works to upgrade the 750-capacity Assembly Hall at Shoreditch Town Hall are now complete

Works to upgrade the 750-capacity Assembly Hall at Shoreditch Town Hall are now complete

Archant

£1m works to upgrade the 750-capacity assembly hall at Shoreditch Town Hall are now complete.

The renovated space will ensure the venue’s purpose built main house will be able to operate at its full capacity since the 1960s, following the installation of 274 seats back into the main balcony space.

The space will be unveiled at the London première of Kneehigh’s Dead Dog in a Suitcase, a radical new reworking of The Beggar’s Opera presenting a twisted tale of modern morality, performed from December 2-12.

Technical facilities and infrastructure have been added to the main space, to meet the needs of a contemporary live performance and music programme.


If you value what this story gives you, please consider supporting the Hackney Gazette. Click the link in the orange box below for details.

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad, serving as your advocate and trusted source of local information. Our industry is facing testing times, which is why I’m asking for your support. Every single contribution will help us continue to produce award-winning local journalism that makes a measurable difference to our community.

Thank you.

Most Read

Most Read

Latest from the Hackney Gazette