Search

CS1

Transport chiefs are at last consulting on a “missing link” portion of Cycle Superhighway 1 that will connect Hackney to Islington along Balls Pond Road.

A four-year standoff over a 100-yard stretch of road will finally end when a missing piece of Cycle Superhighway 1 is built – in spring 2019.

A surge of “aggressive driving” in the streets around Cycle Superhighway 1 (CS1) from car and scooter users means another string of road closures could be on the cards.

Fed up parents and their feisty kids protested outside a primary school over the chronic dangerous driving problem in Stamford Hill.

Transport bosses are planning another round of road closures to beef up Hackney’s CS1 cycle route.

PROMOTED CONTENT

Former teacher Steve shares his experiences as a foster carer for teenagers, from dealing with some of their more challenging behaviour, to the rewards of seeing a child develop into a happy and healthy adult



Newsletter Sign Up

Hackney Gazette twice-weekly newsletter
Sign up to receive our regular email newsletter

Our Privacy Policy

Most read

Hot Jobs

Show Job Lists